72 days until the 31 January 2027 PSTN switch-off: why your office broadband, alarm, and lift line are tied to the same copper pair
- networking
- infrastructure
- broadband
- resilience
Today is Friday 20 November 2026, which leaves seventy-two calendar days until BT and Openreach switch off the UK’s analogue Public Switched Telephone Network (PSTN) and ISDN lines on 31 January 2027. Take out the December telecoms engineering freeze and the New Year bank holidays, and small businesses in London and across the UK have roughly six working weeks left to get migration orders in before the door shuts.
Openreach’s own regional figures at the end of October showed roughly one million legacy copper lines still live nationwide, with around 300,000 sitting inside business premises and 250,473 concentrated in London and the South East alone. When I audit office networks and infrastructure for small firms, the owner almost always tells me they stopped using their landline years ago because everyone uses mobiles now. Then we open the comms cupboard under the stairs and find their office broadband, their monitored intruder alarm, and the warehouse roller-shutter intercom all hanging off that exact “unused” copper phone line.
Why cancelling an “unused” landline kills older office broadband
For twenty years, standard UK office broadband (ADSL and traditional FTTC fibre-to-the-cabinet) rode into the building on top of an analogue PSTN voice pair. Even if you unplugged the plastic desk phone in 2021 and never made another landline call, the underlying voice rental kept the copper circuit alive at the local exchange.
If your office has not moved onto full fibre (FTTP) or a data-only SoGEA broadband circuit, letting that old PSTN line expire—or cancelling the phone number before porting it cleanly—takes your internet connection, your office WireGuard VPN, and your cloud Wi-Fi down at the exact same moment. Worse, Openreach pushed through wholesale price rises in April, July, and October 2026 that roughly doubled the monthly rental on legacy copper lines specifically to nudge holdouts off the old exchange hardware, meaning many small offices are currently paying twice as much for a slower connection that dies in January.
The hidden boxes plugged into phone sockets around your building
Desk phones are the easy part of an all-IP switchover. What catches landlords, clinics, workshops, and high-street offices out are the forgotten boxes wired into secondary telephone extensions ten years ago that quietly dial out at two in the morning:
| Legacy copper line or device | What happens after 31 January 2027 | Clean digital replacement |
|---|---|---|
| FTTC / ADSL broadband sharing a PSTN voice pair | Line ceases or drops to restricted emergency fallback; office internet cuts out | Move to FTTP (Full Fibre) or a data-only SoGEA circuit before porting voice numbers |
| ISDN2 & ISDN30 office switchboards | Complete loss of service (ISDN has zero EVAc emergency fallback) | Port numbers to SIP trunks (if PBX is modern) or hosted VoIP with 5–10 working days lead time |
| Monitored burglar & fire alarm autodiallers | Panel fails to reach the Alarm Receiving Centre, risking commercial buildings insurance cover | Ask your alarm maintainer for a dual-path IP + 4G GSM signalling unit |
| Passenger lift emergency phones (BS EN 81-28) | Two-way emergency button inside the lift car goes dead, forcing the lift out of service | Upgrade the lift autodialler to a compliant 4G GSM gateway with battery backup |
| Door-entry intercoms, gates & dial-up PDQ backup | Gate stops ringing reception; older card terminals fail fallback checks | Switch to SIP/IP intercom or 4G SIM card terminal |
Two mistakes that cost small businesses their main phone number
When a business leaves a telecoms migration until January, panic leads to two expensive mistakes.
The first mistake is ringing your old landline provider to cancel the copper line before your new VoIP provider has completed the number port. Under Ofcom’s General Conditions, you have the legal right to port your existing 020, 01708, or 0800 business numbers onto VoIP. That port only works cleanly while the number is still active or recoverable. If you cease the line first, your twenty-year-old phone number painted on the side of your vans can disappear into quarantine while your broadband goes dark.
The second mistake is forgetting power cuts. An old copper PSTN telephone drew its tiny 50-volt power supply directly down the wire from the BT telephone exchange, so a corded phone still rang when your street had a power cut. Digital VoIP runs through your office router and network switch. When the mains power trips, your phones and internet die immediately unless your router, fibre ONT box, and switch sit on a small Uninterruptible Power Supply (UPS) battery—something I check as standard during office security and resilience audits.
What EVAc actually is, and why you cannot rely on it
You may hear rumours that Openreach has a safety net called Emergency Voice Access (EVAc) from April 2027 for lines that miss the January deadline. Do not treat EVAc as an extension.
EVAc is a bare-bones, last-resort state applied exchange by exchange that restricts eligible analogue lines to emergency calls only. You cannot reserve it, ISDN2 and ISDN30 circuits do not qualify for it at all, and Openreach explicitly warns that it carries zero guarantee that alarm panels, lift phones, or broadband sharing the pair will continue to function.
A sensible checklist before Christmas
Pull out your last three telecoms invoices this week and list every circuit, direct-dial range, and single analogue line you are being billed for. Walk the building from the comms rack to the lift shaft and fire panel, trace every white telephone cable plugged into a wall socket, and get written confirmation from your alarm and lift contractors that their diallers are already on IP or 4G rather than copper.
Order your FTTP or SoGEA broadband upgrade first, put a £90 UPS battery under the router and fibre box, and submit your VoIP number-porting request at least ten working days before your cutover date so your 020 number moves across without dropping a single customer call.
Common questions
Has the 31 January 2027 UK PSTN switch-off been delayed again?
No. BT originally postponed the switch-off from December 2025 to 31 January 2027 to protect vulnerable telecare users, and Openreach has confirmed 31 January 2027 as the final cutoff to place migration orders, with legacy PSTN and ISDN services retiring across exchanges immediately afterwards.
Will our monitored burglar or fire alarm still work if we plug it into the back of a new VoIP router?
Often not reliably. Old analogue alarm modems expect clean copper signalling tones and exchange line voltage during a power cut. Most commercial insurers expect monitored alarms to use a dedicated IP + 4G dual-path communicator fitted by your alarm company rather than an analogue adapter plugged into a broadband hub.
How long does it take to port a UK business landline number to VoIP?
A straightforward single-line geographic number port typically takes five to seven working days, while multi-number ISDN2 or ISDN30 DDI ranges take ten to fifteen working days—and porting queues always stretch out in December and January.
If you are not sure what is still plugged into your office comms cupboard, or want your router, firewall, VPN, and UPS sorted cleanly before the January switch-off, take a look at my Servers and Infrastructure work or Security Audits, or send me a message and we will audit your setup before the Christmas freeze.
